Moshe Dayan Bypass | Haifa
The project included the construction of the Moshe Dayan Bypass Road in Haifa, designed to reduce traffic congestion from Mevo Carmel Road towards the northern part of the city and improve traffic flow throughout the area.
The works included extensive excavation, the construction of a new road, the installation of advanced drainage systems, asphalt works and preparation of the road alignment, as well as the removal of trees required to accommodate the infrastructure and new traffic lanes. All works were executed in accordance with rigorous engineering standards, with meticulous attention to construction quality, safety and the delivery of an advanced transportation solution for the residents of Haifa and the surrounding area.


