Lighthouse Beach | Eilat

The project involved marine works for the rehabilitation and development of Eilat’s beaches following the storm damage that affected the city. The works included coastal cleanup, rehabilitation, and development using advanced engineering equipment and specialized construction methods designed for the marine environment.

The project was carried out with meticulous planning, high-quality workmanship, and strict adherence to engineering, safety, and environmental standards. Its goal was to restore the functionality of the beaches, strengthen the coastal infrastructure, and preserve the shoreline for the long term.