Highway 264 | Beit Kama, Nahal Gerar & Mishmar HaNegev
The Highway 264 Upgrade Project, connecting Beit Kama, Nahal Gerar, and Mishmar HaNegev, was carried out in collaboration with the Israel National Roads Company. The project involved extensive infrastructure works aimed at improving road safety, traffic flow, and the overall quality of transportation infrastructure along this key route. The scope of work included road widening, upgrading drainage and street lighting systems, and the development of supporting infrastructure to meet the region’s growing transportation needs. All works were executed to the highest standards of quality, safety, and engineering precision, while maintaining strict adherence to project schedules and utilizing advanced construction methods. This project represents a significant contribution to the modernization of southern Israel’s transportation network, enhancing road safety, accessibility, and connectivity for all road users.


