Highway 90 Upgrade, Ecological Beach to the Field School | Eilat
A project to upgrade the section of Highway 90 between the Ecological Beach and Nahal Shlomo, designed to improve road safety, infrastructure quality and traffic flow along one of the Eilat region’s principal transportation routes.
The project included earthworks and asphalt works, the installation of road base layers and kerbstones, drainage works, lighting columns, upgrades to associated infrastructure and environmental development. All works were executed to a high standard and in strict compliance with rigorous safety and engineering requirements.
The project significantly enhanced the driving experience, strengthened the region’s transportation infrastructure and provided residents and road users with a safe, efficient and durable solution.


